Bathrooms are one of the smallest rooms in the house and they are also one  the most costly to renovate. Bathroom renovation is a job that, if done well,  can add value to a home and a great space full of design and light.

Bathroom design

Bathroom design is the first area of your bathroom renovation you need to get  right. Just replacing the existing bathroom with the same design may not be  enough. The key to great bathroom design is to design it with the people that  are going to use it in mind. However be sure that your bathroom design also has  a general use factor as well. For example: If you were designing a bathroom for  families you could still design the bathroom with easy access to the shower and  bath. This would ensure that the design would also work for people with limited  mobility. This means if you decide to sell your home or if you are renovating  for profit your design has a wider market appeal. Great bathroom design also  uses the space well, taking into account the light or window space, size of  fittings, and drainage options. Draw out a plan to scale and right down the  sizes of your room. Mark the existing drainage points and then and water inlet  points. Write down a wish list of the bathroom fittings to need and want with  their sizes. Now marry the two together and see what fits. Note: Most bathroom  drainage and water inlet points can be moved but this does come at extra  cost.

Bathroom Renovations

Bathroom remodel

If you have decided to do the work yourself or part of the work it is time to  hire a skip bin and pull out the old bathroom. If your home was made pre 1980  you may have fibro bathroom wall linings with asbestos in it and great care will  need to be taken. You will need some full body disposable overalls, eye  protection, and quality dust mask. Check with your local building authority or  council regarding the regulation on bathroom asbestos wall lining removal.

Remove everything except the plumbing. If you keep the bathroom plumbing in  place you will not have to turn the water off for the whole house. Also you will  need to jack hammer the floor tiles up and the sand and cement bed that they are  laid on.

Bathroom Renovations

Bathroom Renovation and construction

Bathrooms must be construction properly from the ground up to ensure that the  finished job is correct and true. This also ensures the design and look of the  bathroom will have a great finish

virtual house painting

The Bathroom Renovation Process

  1. Install water and drainage pipe and electrical wires.
  2. Install wall lining and ceiling and then install the bath hob and bath.
  3. Waterproof the floor and shower and bath recess.
  4. Correct the fall of the floor with sand and cement ready for tiling.
  5. Lay floor and wall tiles and then grout.
  6. Install new bathroom vanity, fittings, and taps – install new  electrical.
  7. Paint ceiling and final clean.

Bathroom Renovations

Step one – Plumbing and  electrical

At this point all new plumbing is installed for clean hot and cold water and  drainage. Careful attention needs to be taken when positioning the new plumbing  so that the plumbing fittings are correct when the tiling is finished. For  example: To centre a fitting in a shower recess you must take into consideration  the thickness of the wall board, tile glue and tile so the fitting will be  centred after the tiles are in place. The same applies to installing drainage  pipes for a toilet; the wall lining and tile thickness must be taken into  account so the pipe is in the correct position when the toilet is installed  after tiling. Also rough in the any new electrical wires without connecting them  to the mains power.

Bathroom Renovations

Step two – Install wall and ceiling linings

Install your 6mm wall lining being careful to nail the fibro board every  150mm without nailing into the new pipes and electrical wires. The best way is  to measure and mark the pipe and wire layout onto your new wall board with a  pencil as you go. Screw up (or nail) the ceiling lining, plasterboard is the  most common. However if you are laying your tiles from floor to ceiling do not  install the cornice as this is best done after tiling. If you are not tiling to  the ceiling go ahead and install the cornice after the wallboard and ceiling  lining have been installed. Also if your bath is not freestanding you can now  make up the frame and install the bath. Ensure the bath is installed correctly  allowing for the thickness of the tiles and glue.Be sure to check all linings  and pipes before you continue with your bathroom renovation.

Bathroom Renovations

Step three – Waterproof your bathroom

Waterproof your bathroom floor, shower recess, and around the bath. When  waterproofing the floor ensure that the waterproofing comes 100mm up the walls.  The shower recess will need to be waterproofed 100mm above the shower rose  outlet. Also the bath should be waterproofed 100mm above the lip of the bath  right around and to the floor. At the doorway install a 25 x 25mm aluminum angle  glued into place with quality silicone and waterproof into the lip. Your whole  bathroom should now the tanked, so the all water will only go down a drain.  Bathroom waterproofing tip: waterproofing is an easy job but quality and  accuracy is most important.

Bathroom Renovations

Step four – Lay in the cement screed for the floor.

Before the floor tiles can laid the floor must be smooth and fairly flat with  a slight fall to the drainage outlet. To do this you must use sand and cement  mix and it is best to add a waterproofing agent into this as well. With a level,  set the floor level at the doorway. Use the top aluminum angle as the finished  floor level and measure down the thickness of the tile plus 10mm for the glue.  Mark right around the bathroom with a level and then screed in your sand and  cement mix with a 1 to 3 degree fall to the top of the drain outlet. Take your  time and get it right with the finished level as smooth as possible. When the  sand cement mix has set but is not dry (you can walk on it but you it is still a  bit soft) rub it over with a house brick. This will remove all the small highs  and lows and check with a level as you go. Let the bathroom floor fully dry and  then you should have a great surface to tile onto. Tip: the more work you put  into the floor screed the easier your tiling will be.

Bathroom Renovations

Step five: Tile floor and walls

Lay your tiles on the floor first and then grout. Then lay your wall tiles  making sure that they are level as you lay. Once the bathroom tiles have been  cut and laid, grout all your tiles and then buff the tiles clean.

Step six: Install plumbing fitting and fixtures

Install all your plumbing fittings and taps. Also fit all your towel rails  and soap holders. Fit your new bathroom vanity making sure it is level and  sealed around the top with silicone and also seal around the bath. Tip: make  sure they are in the right place before you drill into your tiles.

Bathroom Renovations

Step seven: painting, and cleaning – enjoy

Paint your ceiling and do a final clean making sure everything is fitted  correctly and that there are no leaks in your plumbing. – Enjoy your new  bathroom.[Via]

If you’d like to find out how your bathroom  will look like in virtually with any color combination you can try our house painting software and choose colors from such well-known color collection as California Paints Millennium, PPG, Behr, Benjamin Moore, Sherwin Williams, Colortrend, RAL, Sikkens, ICI Paints, Symphony and others (115 different sets, more then 57,000 colors).

 